Before I put the frame in the vacuum bag, I added a few layers of carbon as bottle boss reinforcements. One I surrounded with flash tape, the other I did not. They both got wrapped with shrink tape.
Here is the head tube wrapped in release cloth. I tried to keep it as smooth as I could to help make for a smoother finished joint.
After wrapping the other joints I covered them in bleeder and "connected" them with some more to where I put the vacuum fitting in.
This is a shot of the frame in the bag with vacuum pulled to test for leaks and to make sure there was enough slack/stretch to conform to all the joints.
I folded the bag back on itself inside the rear triangle to avoid stressing or crushing them or pulling things out of alignment.
I managed to get around 25-26 in Hg and it was consistent so in the oven it goes.
Here is the oven and compressor running and of course a pile of crap on the handy "shelf" conveniently located on top of the oven.
Not it's time to pace back and forth staring at the vacuum gauge for 3 hours. Actually I checked it once the oven reached 250F then left it to cook.
No comments:
Post a Comment